199 Bishopsgate

London, EC2
British Land / Blackstone JV
Practical completion 2012
150,000 sq ft
£24m
Office

John Robertson Architects
Meindhart (UK), Structural engineer
Chapman Bathurst, Services engineer
Como, Main contractor


The refurbishment of this 150,000 sq ft office building was about improving the value of an asset through uplift in quality rather than quantity. As part of the prestigious Broadgate development, 199 Bishopsgate was built in the 1990s to provide high quality offices.

M3 undertook feasibility studies to establish optimal potential for the building focusing on refurbishment, extension and conversion options. M3 then led the team through design and delivery of a modernised, flexible Grade-A office space with enhanced ground level retail and reception, while achieving BREEAM Excellent.


Related projects
Broadgate

Project highlights


  • Assessed viability of a range of uses including conversion to hotel and office refurbishment
  • Directed design team to ensure achievement of client's updated sustainability objectives, including BREEAM rating of "Excellent" and an improved energy performance rating of "B"
  • Secured programme savings through coordination of strip out contract with phased vacant possession
  • Acted as Employer's Representative and Contract Administrator to efficiently deliver the main construction contract, completing in 14 months
  • Building fully let within 28 months, achieving target rents